Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering CO., Ltd. Southwest
Authorized by:
China Petroleum Engineering CO., Ltd
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

Your Position :Home->Past Journals Catalog->2019 Vol.1

Analysis on Initial State Safety of Pipeline Shutdown During Crude Oil Forward and Reverse Transportation
Author of the article:Zhou Gang1, Wu Honglei1, Liu Yang2, Jin Yuxin3
Author's Workplace:1. SEPCO Electric Power Construction Corporation; 2. Petroleum Development Center Co., Ltd., Sinopec Shengli Oilfield ; 3. China Petroleum Engineering & Construction Corp. Southwest Company
Key Words:Forward and reverse transportation; Initial state; Shutdown; Safety; Safe shutdown probability
Abstract:

 To define the relationship between initial state and safety of pipeline shutdown under the progress of forward and reverse transporting, the forward and reverse stages have been divided into 4 stages:forward cold oil control stage, forward hot oil control stage, reverse cold oil control stage, reverse hot oil control stage.And under the analysis of pipeline temperature drop on different running stages, qualitative analysis on safety of different initial state of pipeline shutdown is carried out from oil temperature changes.Lastly, a new variable “safe shutdown probability” is defined.Quantificationally, the initial state safety of pipeline shutdown on different moments of oil forward and reverse transporting is analyzed.It turns out that while, shutdown is of the lowest safety; while, shutdown is of the highest safety.

CopyRight©2019Natural Gas and Oil Editorial Office Reserved